PROJECT: 10-016
(WWL001A), James
R. DiIorio Water Reclamation
Facility
Ammonia
and Nutrient Removal – Section 1 – Site Dewatering
MANDATORY Pre-Bid Meeting: March 2, 2010, at 10:00 a.m.
at
James R.
DiIorio WRF, 1300 S. Queens Ave., Pueblo CO
81001
Submittal Deadline: March 10, 2010
at 10:00 a.m. (MDT)
The James R. DiIorio Water Reclamation
Facility provides basic secondary treatment and has a rated maximum month
capacity of 19 million gallons per day. The proposed work generally
consists of construction of eight dewatering wells, furnishing and
installing eight new well pumps and associated down hole equipment,
modifying four existing wells to include installation of pitless units,
capping and abandonment of one existing well, yard piping work, flowmeter
vault, and electrical work.
Bidder attention is called to the fact that
this project is subject to the State of Colorado Construction Bidding
Requirements for State Revolving Fund Loan Projects as described in
Article 4.
Questions regarding the project shall be
addressed to the attention of Dwight Sayles at: Black & Veatch
Corporation 720-834-4225
Plans and specifications may be obtained
from the office of the Wastewater Department, 211 East “D” Street, Pueblo,
Colorado 81003 or at the office of Black & Veatch Corporation at
the address listed above. Plans and specifications may be
obtained at a NON REFUNDABLE cost of $85.00.
- Advertisement
- Prebid Attendance List &
Planholder List will be posted when
available
PROJECT: 10-017
(WWL001D), James
R. DiIorio Water Reclamation
Facility
Ammonia
and Nutrient Removal – Section 4 – Lift Station Renovations
MANDATORY Pre-Bid
Meeting: March 2, 2010, at 1:30 p.m. at James R. DiIorio
WRF
1300 S.
Queens Ave., Pueblo, CO 81001
Submittal
Deadline: March 10, 2010 at 10:30 a.m.
(MDT)
The proposed work consists of
miscellaneous piping and electrical system renovations and improvements at
four of the City's wastewater collection system lift stations. The
work is located near the Pueblo Airport and included bypass pumping of
wastewater during construction.
Bidder attention is called to the fact that
this project is subject to the State of Colorado Construction Bidding
Requirements for State Revolving Fund Loan Projects as described in
Article 4.
Questions regarding the project shall be
addressed to the attention of Dwight Sayles at: Black & Veatch
Corporation 720-834-4225
Plans and specifications may be obtained
from the office of the Wastewater Department, 211 East “D” Street, Pueblo,
Colorado 81003 or at the office of Black & Veatch Corporation at
the address listed above. Plans and specifications may be obtained
at a NON REFUNDABLE cost of $85.00.
- Advertisement
- Prebid Attendance List & Planholder List will be posted when
available
Project: 10-019, Swimming Pool Maintenance
Supplies for Parks 2010
Submittal Deadline: March
18, 2010 at 10:30:00 AM
Project: 10-029, Bedding Plants and Perennials for
2010
Submittal Deadline: March 9, 2010
at 11:00:00 AM (MT)
In general the successful bidder will provide specified bedding plants
and perennials as detailed in the IFB. Bid will be awarded to the
vendor offering the lowest and most responsible grand total.
Project: 10-030, Trees for Parks
2010
Submittal Deadline: March 11, 2010 at 11:00:00
AM (MT)
In general the successful bidder will provide
specified trees as detailed in the IFB.
Project: 10-032, Sprinkler Heads
and Valves for Parks 2010
Submittal Deadline: March
15, 2010 at 10:00:00 AM
Project: 10-033, Pool Chemicals for
Parks
Submittal Deadline: March 18, 2010 at 11:00:00
AM
Preliminary Results